China Construction Machinery Business Online
Sany equipments support China-Laos Railway construction
Post Date: 2017-04-21

 With the full length of over 400 kilometers, China-Laos Railway stretches from Mohan-Boten border in the north to Vientiane in the south, which is considered to shorten the traveling time between Vientiane and China-Laos border from 12 hours to 3 hours when finished. Predicted to be built for 5 years and invested approximate RMB 40 billion, the railway is called another “super project” in Asia.

With the last set of SANY trailer pump in the first order delivered from SANY to China-Laos Railway Project on April 13th, there were more than 10 sets of SANY equipment arrived at the destination till the present. The railway construction will be quickened while the monsoon of 2017 has not come yet. In order to put the batching plant that arrived first into use as soon as possible, SANY service engineers conquered difficulties to install the machines. Till now, the pump, truck mixer, motor grader and road rollers have started to work and more SANY equipment will join the project with the construction proceeding.

The China-Laos Railway not only carries Laos’ dream of transforming from “Road Locks Country” to “Road Connects Country” but also a critical step to further promote and practice the “Road and Belt Initiative” that brings benefits to the people along the line.

Since entering the market of Laos in 2013, SANY has become the first China brand that ranks NO.1 in local sales of excavator, motor grader, pump, rotary drilling rig, truck crane, batching plant, etc. Both of the two countries place great expectations on SANY equipment to make an excellent performance in this great project.

Key Words: Sany
 Picture news
[LU-ICP-05030001] Copyright© 2000- China Construction Machinery Business Online
Address: No. 26, Tonghe Road, Laishan District, Yantai City, Shandong Province.
Mail to us: xutt@21-sun.com
TEL: 0086-535-6792764 FAX:0086-535-6723239