Max. drilling diameter | 350mm |
Max. drilling depth | 126m |
Max.winch speed | 600m/min |
Crowd cylinder Max.lifting force | 500kN |
Crowd winch Max.crowd force | 6-22kN |
It is suitable for medium-sized pile foundation projects such as housing building, bridges, and municipal construction. The site transfer is flexible. The rotary drive has multiple gears, resulting in high overall construction efficiency. The new generation of cab features sound insulation and noise reduction, and has a wide field of view and a more comfortable operating environment.
Max. drilling diameter | 350mm |
Max. drilling depth | 126m |
Max.winch speed | 600m/min |
Crowd cylinder Max.lifting force | 500kN |
Crowd winch Max.crowd force | 6-22kN |